Набор данных из Zenodo · Yulianto, Hubertus Davy

Database

Лицензия
CC BY 4.0можно в коммерцииТекст лицензии
Лицензия разрешает коммерческое использование. Обычно нужно указать автора — точные условия в тексте лицензии.
Форматы
XLSX
Размер
28 кБ
Обновлён
17 янв. 2026 г.

Описание

In 2024, the forecasted physical availability of heavy equipment at PT. BMC was 89%, using a simple average method, while the actual values ranged from 85.33% to 89.92%. The average difference between the forecast and actual values was -2.02%, with the largest gap occurring in the month with the lowest actual value, at -3.67%. This inaccuracy indicates an over-estimation bias that could impact operational planning. If the issue of misforecasting continues, the company will face challenges in predicting or planning unit replacements. Consequently, declines in availability will become unpredictable, leading to consistently low equipment availability and disruptions in operations. This study aims to train a regression-based machine learning model to identify the model with the best evaluation performance based on field parameters such as equipment condition, equipment age, equipment hours meter, maintenance frequency, equipment activity, and historical maintenance records. This approach will provide more accurate predictions aligned with actual field conditions. PT BMC will also be able to identify the parameters closely related to availability using multivariate analysis. Based on…

Описание из Zenodo, сокращённое.

Файлы (1)

  • XLSXDatabase .xlsx28 кБ

DataHunter не хранит и не раздаёт эти файлы: каждая ссылка ведёт к первоисточнику. Перед использованием проверьте там лицензию.

Найти другие наборы